Posts

Showing posts from October, 2024

A Determined Effort

Image
Over the past week, we’ve made some incredible progress with the roof slating. The north face is now watertight, and we’re about halfway up the south face. As I mentioned in the last post, we’re pushing through regardless of the weather, and it’s paying off. A few nice days have also helped, and the progress is very pleasing. We’re using reclaimed Welsh slate, which varies in thickness and size, making it a bit challenging to achieve the professional finish we’re aiming for. However, with patience (and a few hiccups along the way), we’re very happy with the results so far. When we reach the top of the roof, I'll be sure to let you know.

Ground Signals

Image
 ...which also require benches, which need the Moles of Kirkby Stephen in order to plant them! The ground signal, or dolly, reading out of the bay platform was the first to be tackled, although not the first to be completed. We had been given an LNER ground signal that was seized up: we built a bench upon which to mount this, as well as carry some flat wheels to take wires for other signals underneath the adjacent track. The application of heat and brute force enabled the signal to be dismantled, cleaned up properly and painted. Jim, Sue and Mike P keep working the spindle in the casting, having already freed up the rest of the linkages Jim continued cleaning up the signal prior to painting Since the bench had been built up in advance, we knew the hole sizes required for planting. Or so we thought! Unfortunately, we discovered the water column feed pipe lay right where we'd planned to put one leg, so had to adjust and dig out even more "allsorts", contending all the while...

Benches... No End Of Benches!

Image
Having previously discovered the remains of an original bench, right where we needed to place a new bench, we continued to dig, curse and plant! First leg set I place, second being levelled up to suit Both legs in situ, with the bench top placed, ready for marking (as to where the holes need to go), drilling and bolting together. This bench carries two compensators. Benches have also been made for the wire wheels and ground signals, but these have wooden legs. 

Welsh Slate

Image
We have at last managed to get 4 coats of paint onto the fascia boarding of the signalbox and the attendant woodwork, leaving us free to commence slating the roof at last. We were keen to create a period look and therefore opted to use reclaimed welsh slates some of which I would guess have already seen many years of service, but were still good for many more. In the past as you will recall that rain has, on many occasions, brought work to a frustrating standstill and created havoc with work we thought was complete. That being said, slating is one job you can carry on with rain or not and so we did on Tuesday, ignoring the showers, getting wet, and revelling at being able to stick two fingers up at the weather. It is not going to improve much at this time of year so I suppose we will get several more soakings before the roof is watertight but I will tell you about them in due course.