Really looking like a Signal Box now!
The fitting of the steps of the S&DR Signal Box signifies that we are fast approaching the final stages of the build. We have yet to complete the wheelchair access platform at the top of the steps which will allow access to the ‘box from the newly constructed footpath.
Some cosmetic work at the foot of the steps will have to wait until Tim and his redoubtable signalling team have installed a plethora of point rodding, pulley wheels and bell cranks, all of which, will eventually determine exactly where we need to place the first step.
We hope as many of you as possible will visit over Easter when you can see at first-hand the work we have been doing.
Comments
Post a Comment