Posts

Showing posts from September, 2025

What's In A Name?

Image
Well, it would seem there's plenty of scope for confusion! Hopefully this post will deal with some of the oddities, rule out the absurd, and maybe even share a bit of the history; all coupled to recent progress. Kirkby Stephen East. Well, that's obvious, isn't it? The most easterly-located station in Kirkby Stephen. Meaning the other station (on the Settle - Carlisle) was called Kirkby Stephen West.  But for many years, such a distinction was unnecessary: it was either the North Eastern station or the Midland station, according to the operators of the lines in question. Even after the Grouping, the two stations were run by different companies, so the distinction between the stations fell in line with this: either LNER or LMS!  The issue only really arose after Nationalisation, when both stations serving Kirkby Stephen came under the control of BR, albeit different regions initially. In order to try and make it easier for their customers, the use of East and West came about,...

Assembly Of Ground Signals...

Image
...and planning ahead for their maintenance! Quite a lot of repetitive actions here: drilling out greaseways, tapping to fit grease nipples, bolting things together! First up were the balance levers for the LMS-pattern ground signals. These had previously had grease nipples fitted in most cases, so only required the threads cleaning up with a tap. The one that hadn't, required drilling out first. Why so many balance levers for just 2 signals? Well, this is a case of planning ahead. The two signals in question née to be able to be controlled from either the S&D box OR the Junction box. This is done by each signal having a wire from each box to a shortened balance lever, and whichever is operated will lift the longer lever (by means of a solid bar welded to it, which will be completed shortly!). Control between the two boxes is to be tied up electrically and mechanically. Hence, 6 levers for 2 signals! It was then on to the LNER-pattern ground signals, which were originally drill...

Signals!

Image
This post covers progress with the NER Central Division signals. Previously we drilled all the front bearing castings for the NER CD signals. This left the rear bearing castings to tackle, but these are slightly more complicated, as the hole needs to be drilled at an angle, so as to match the post taper. This was achieved by marking out the centre, then carefully setting up the casting on the radial arm drilled table, clamped accordingly. A pilot hole followed, being opened out gradually until 1.1/4" diameter was reached. Note the shimming at the two ends of the casting to get the required taper The corner mounting holes will be marked out individually to suit the individual posts: just to take into account and variations in the drilling. Hopefully they will all end up the same... Once the first on was completed, it was fitted to the post for No.17 (the Tebay platform starter), marking the first new CD signal assembly for well over 100 years! The spectacles required a little more ...