Posts

Showing posts with the label S&DR

Supporting the Leadout Bench

Image
A high-intensity, all-action day on site saw three members of the team heaving, wrestling, levering, wedging, propping, bolting and finally concreting all ten lengths of supporting rail for the leadout bench into their final resting places. This was quite a big job, as I’m sure you will appreciate. Those lengths of rail will go where they want to go, not where you want to put them, and they really took some persuading. The next job will be to brick them into the walls on which they are now resting, completing an immensely strong and stable base for the installation team to build upon. Very shortly, we will be wrestling with the even longer lengths of rail that will support the brickwork over the leadout slot, but that is another story.

Bits and Pieces

Image
If you think back to the frame installation last year, you may have realised that the main girders, upon which the frame sits, were not held in place: relying on gravity. We had a plan for this (well, actually two plans...); to use steel angle to locate it against the side walls of the box, preventing any movement. The six pieces of steel were cut to length and drilled some time ago, and have appeared in various photos in different layers of paint! Following a lot of rearrangement underneath the box, we gained access to shere we needed to be: in a constricted and awkward space, behind and underneath the frame itself. It was simply a matter of drilling in to the blockwork, then winding in the thunderbolts. The two support girders (which are fastened together) are now prevented from moving by three bits of angle at each end. Apologies for a lack of photos: as happens so often, we got stuck in to ticking this little job off the list, and completely forgot! It would have been awkward to ta...

A Sticky Situation

Image
After the initial rush to progress the frame installation ready for the S&D 200 celebrations at Kirkby Stephen East (an excellent event held over the August Bank Holiday in 2025), it was now time to paint and ‘fettle’ the levers in readiness for their operational role. I n most cases, it was just a case of building up layers of paint, in various colours to suit their intended function… Demonstration Section However, after painting, lever No. 9 (facing point lock for No. 8 points, at the station end of the headshunt crossover) had developed a problem with its catch-block deciding to stick in the raised position! Catch-blocks are heavy and designed to drop into a notch when the lever is in either the normal or reverse position and prevent the lever from accidently moving. If the block doesn’t drop by gravity, then there is a risk of the lever being left in mid stroke. Since painting, lever No. 9 had developed a sticking point whereby its catch-block wouldn’t drop back down. ...

The Arms Race Is On! (Part III)

Image
Following on from the previous two posts concerning Central Division signals, we now have Part 3.. This concerns a trip Matt and I made, up to Fighting Cocks Station, near Darlington, to meet up with Norman Hugill. The original (Central Division!) signal from the station has been returned there, to (hopefully) be re-erected as a reminder of the line. However, for the time being, it lies in its component parts, and includes various parts we have not seen anywhere else! Particularly of note is the landing and the balance lever arrangement. Both of which we need to duplicate in order to complete our signals at KSE! We duly headed up, armed with tape measures, pens and a clipboard. The arm. First of all, we discovered the original wooden arm was only 4' in length (which would give 3'6" beyond the post), although it does look shorter than most from the photos in situ. Secondly, the edges were all rounded off, which answered a question I'd had rumbling around in the back of ...

Déjà Vu at the Junction Box

Image
A distinct feeling of déjà vu today, as the Junction Box building team descended into the decaying remains of the box foundations and began removing approximately 3,000 bricks. These were held together (if you can call it that) by the metamorphosed remains of lime mortar, which had turned into something akin to dirty sand. The concrete footings thus exposed will have core samples taken and professionally examined to confirm whether they are suitable for reuse. All the bricks will be cleaned and reused with modern cement to rebuild the footings. This is a significant amount of work, but it will save us a great deal of money. After many more hours of back-breaking work, all remaining decaying brickwork was removed and stacked ready for sorting and cleaning. This laid bare the original concrete base, which will be professionally cored and evaluated to determine its suitability for reuse. Initial examination shows that there were no foundations whatsoever for either the internal wall that ...

The Arms Race Is On!

Image
Looking back over recent work and previous blog posts, there is more to report on the North Eastern Railway, Central Division signals. A lot of research and a lot of physical work has been taking place in order to get the arms themselves sorted. As you may remember, or have noted from previous entries, the Central Division was unusual on the NER in NOT having slotted posts, with the arms inside. Very few bits of CD signals remain, and we were lucky enough to have a complete set of castings for the masthead.  When it came to the length of the arms, however, things got a little trickier, since initially we did not have any drawings or specifications. Fortunately, at Kew, there are various documents and drawings. We were given a photograph of one of these drawings, which contained what we thought was a definitive answer: the arms are shown as being 4'6" long, beyond the end of the arm weight casting. Having tried to source these in Cedar without any success (they are rather large...

More Mole Activities

Image
As the weather permits, the Moles have been busy digging for victory... but it feels as though we're going round in circles. We dig a hole, plonk a lump of concrete in it, and fill it back in again! Rest assured, the work does have a purpose: this is the installation of the concrete bench legs for the rodding run. If we can get them all in before the weather turns, we won't be drowned Moles!! We can then tackle fitting the tops later on, in the knowledge that the hardest, physical work has been completed. The ground varies significantly from hole to hole, but we have managed 2 concrete legs a day, combined with other tasks on site. These photos are from the last two days on site, and this section of the rodding run sits between the Tebay and Eden Valley lines. We didn't want to tackle this part of the run any earlier, given the focus on getting the box looking complete internally (more work will take place on days when the weather leaves something to be desired!!). Our digg...

Dig, Eat, Sleep, Repeat...

Image
No rest for the Moles. We've been putting off digging for the next benches that require installation, owing to the need to get the box progressed with the frame, in readiness for the big gala... Whilst the weather is good, we could no longer put off the digging, and set to with the largest excavation. Just outside the box, we squeeze a bench for most of the signal wires to run on flat wheels, carrying them underneath the 4 lines. In the same place, we have to get wire stakes in place for the other signal wires, ducts to feed on to the Junction box as well as leaving enough space for the drainage run. We moved the bench so that it was adjacent to the hole, using a small trolley. Timmy's help with the digging wasn't necessarily constuctive... If that weren't enough, the ground we had to dig, to the levels required, had a few 'challenges' to overcome. Such as big rocks, cement leftovers from the building works and a mound of rubble! Motivational encouragement was p...

What's In A Name?

Image
Well, it would seem there's plenty of scope for confusion! Hopefully this post will deal with some of the oddities, rule out the absurd, and maybe even share a bit of the history; all coupled to recent progress. Kirkby Stephen East. Well, that's obvious, isn't it? The most easterly-located station in Kirkby Stephen. Meaning the other station (on the Settle - Carlisle) was called Kirkby Stephen West.  But for many years, such a distinction was unnecessary: it was either the North Eastern station or the Midland station, according to the operators of the lines in question. Even after the Grouping, the two stations were run by different companies, so the distinction between the stations fell in line with this: either LNER or LMS!  The issue only really arose after Nationalisation, when both stations serving Kirkby Stephen came under the control of BR, albeit different regions initially. In order to try and make it easier for their customers, the use of East and West came about,...