Putting The Frame Into The Box - Part 1
Just a quick post this time before Christmas: the first step towards putting the NER Central Division frame into the signal box!
Having produced various drawings after lots of measurements in the early days of the project, we finally offered up the first components to the floor joists to check everything fitted nicely before we got too carried away.
Here we see Steve and Matt offering up a single quadrant, with the two brackets attached. These brackets both steady the frame and support the floor over the locking trays. Bob looks on in despair at our interruption to his work! He should be very content indeed, having built the box to suit the frame perfectly!
We were trying to ascertain the exact level for each component, so that it all ties into the floor seamlessly.
Once the remaining internal scaffolding comes out, we will be setting up the stanchions on the girders, so everything must end up at the correct height!