Underway At Last

The laying of a couple of hundred bricks over the last few days has, at last, seen the walls of the Junction 'box rise to ground level.

The site is so awkward to access and get materials to that much of our time is spent preparing to lay bricks rather than actually laying them. However, work is finally underway, with plenty to think about.

While we wait for the support rails for the lead-out bench to arrive, we have several tasks to complete. We need to prepare and build the bench access slots in both sides of the building, together with small cable access slots at ground level at each end of the structure. In addition, we need to install the stone step for the locking room doorway and, of course, fit a damp-proof course six inches above ground level.

Only then will we be ready to continue laying the remaining 17,000 bricks.

Watch this space.


Comments

Popular posts from this blog

Jumpstart the Junction!

A Sticky Situation

Joining the Dots...