Ground frame progress: Locking
Having assembled and fettled the ground frame, so that each lever worked smoothly and the catch engaged properly, it was time to tackle the locking.
Lever 1 was our 'new' lever, and to be used as the release lever, with the Annett's Lock fitted. Nothing can be moved unless the train staff is captive in this lock. This prevents any train movements taking place elsewhere, in conflict to the operation of the ground frame.
Pulling Lever 1 releases Lever 2 (or lever 5).
Lever 2 is the facing point lock on the Eden Valley line for the Turntable road. Pulling the lever withdraws the bolt from the points, and this action releases Lever 3.
Lever 3 operates the points and trap points to allow access to or from the Turntable Road from just outside the Junction box. These are normally set for the running line.
Lever 5 is released by Lever 1 only if Lever 2 is not pulled. It controls the facing point lock for the main junction point governing travel to either the Eden Valley line or the Tebay line from the station's Darlington platform. It also has an electric lock on it, which is released from the signal box lever frame. This ensures no other train movements can conflict.
Lever 4 is released by Lever 5, and actually controls the points associated with the junction. There is more to the operation than just these measures...
So, the locking table looks like this:
<TO FOLLOW: Locking Table>
And from that, the locking itself develops into a dog chart.
<TO FOLLOW: Dog Chart>
Once you have the drawing, it's time to transfer that into reality: we placed the locks in the correct places, and labelled them so they could easily be identified.
![]() |
| lock in place, scribing around |
Next, each tappet was polished up individually, then scribed for the cut outs to accommodate the locks, according to the locking. These cut outs need to be carefully measured (in terms of depth) to ensure the correct amount of movement is allowed. To make matters easier, the scribings were then outlined using paint marker, to prevent cutting too deeply.
The tappet was then removed, and cuts made to remove the unwanted material. Care was taken to stop short of the scribed lines. An angle grinder was used here: slitting and grinding discs to get a rough cut out. Then draw filing to get a good finish: sore shoulders and upper arms resulting!!
![]() |
| Angle grinder work |
Test fitting was carried out before reaching full depth, allowing greater confidence in how it fitted together: you definitely don't want to take off too much metal!
![]() |
| Filing away towards the scribed line, followed by a test fit: more to remove!> |
Each cut out was tackled on its own, one tappet at a time. The locks were tested into each notch, using the levers to drive them.
![]() |
| Almost there |
Once all the notches were cut, and the locks moving nicely, it was time to make the bridles that drive the locks (the horizontal links on the drawing). These are made of flat bar, with pins riveted through, in the correct places! Careful marking out is the key here, so as to get the holes in the right place and then to holt the pins steady when riveting over.
![]() |
| Locks and notches completed, pins sat in place, awaiting bridles |
![]() |
| Bridle with pin in place, being riveted over |
Testing and checking was, again, key to this.
![]() |
| Bridles in position for testing purposes |
Once completed, with every component stamped up with an identification, based on its positioning; it was time to dismantle, clean and oil. Then we could check the identification stampings and test everything once again.
![]() |
| Trays emptied and being cleaned out |
![]() |
| Heap of (hopefully correctly-) labelled locking |
![]() |
| Cleaned and oiled locking tray, awaiting the locking to be returned |
Once all the locking was correctly returned, it was all tested again, against the drawings, by independent S&T members who had not carried out the locking work.
![]() |
| Reassembled and ready for finishing off jobs! |