Joining the rodding to the levers... PART 1
The point rodding runs were planned out very early on, but as I've referenced previously, sometimes reality hit home, hard! A lack of space to actually do what we'd planned led to a few alterations along the way, one of which actually reversed the direction of travel for the rodding when the lever was to be pulled. This meant we had to correct the direction underneath the box, at the point where the lever pulls up, and the rodding has to move horizontally. This is achieved by having a vertical crank, and more specifically, which way around it is sited... Vertical crank: Option A is the standard positioning which we had planned for. Option B is the location we had to adopt in order to change the direction of the rodding to match up properly. Space underneath the box is especially tight, and the optimum position for the vertical cranks was found to be where the end was in mid air, thus unable to be bolted down. Fortunately, Rob Murray had an offcut of heavy steel plate which I re...