Starting the Floor

After many months of battling the weather to erect the signal box, the time has come to introduce a little refinement to the build by starting to fit out the interior. We have begun by fitting a stone hearth to complement the fireplace and laying the floor joists for the area that borders the lever frame aperture between the doorway and the fireplace. Work is hindered at the moment by the scaffolding as we wait for it to be removed which should happen shortly allowing us to begin work in earnest.

There is much to do outside yet with the steps to construct and also the platform at the top of the steps which will allow wheelchair access to the interior of the ‘box for our disabled visitors.

I think this will be the last blog of the year, so have a Merry Christmas and I will keep you all posted with developments in the New Year. 

Comments

Popular posts from this blog

Fitting The NER Lever Frame

NER Northern Division Lattice Signals

The Rafters – Part 1