A Rodding Run Odyssey

Having dealt with all the levelling and aligning of the stools for the first section of the rodding run in the previous entry, we now wanted to get everything as "finished" as we could.



We started by assembling the A-frames and rollers, then bolting them down onto the planted stools. The next stage was to tidy up the earthworks (the remains of the mole hills!) and leave a nice, smooth ground surface. The rods were then added, being slid onto the rollers and loosely bolted together to give a good idea of how it will look when completed. The rods will be adjusted once the cranks, compensatory and all the benches are in place, but to do any more at this stage would tie us up in knots!


Finally, we disposed of the excess soil / ash / muck / digging to help build up the embankment near the Junction box, making the ground frame's rodding run a better product. We also had time to shift the next 5 rodding stools into place, ready for the moles to get busy once more. Time was also spent on the marking out of the rest of the rodding run, including the centre lines for the various benches.


Thanks for reading and keep checking back for further updates!

Comments

Popular posts from this blog

Fitting The NER Lever Frame

NER Northern Division Lattice Signals

The Rafters – Part 1