Raising the Roof

A fine spell of weather saw us make a concerted effort to finish the T&G boarding of the signalbox roof and, late on Saturday afternoon, the final nail was hammered into place giving us a roof at last. Not waterproof yet I admit, but it soon will be.

The next step will be the fitting of the under sarking (waterproof membrane) and slate battens, followed by the barge boarding and finally the reclaimed slates that we have acquired.

All this takes but 2 minutes to write down and a lot longer to accomplish but, rest assured, we will keep you updated with each successive step. After all, when the roof is waterproof, we have the inside to fit out with an absolute host of equipment all currently being cleaned, repaired and assembled by our brilliant signalling team, so lots more to come – just keep watching!