If You Go Down (Under The Box) Today...

 ...you're sure of a big surprise!

The previously prepared girders (which will support the frame) were moved into position, so as to triple check the vertical dimensions. These sit on top of the block pillars that Bob and his team built into the box in the very early days of its construction!

With a little chipping away, dropped mortar was cleared off the top of the plinths, and the two girders lifted into position. These support the frame in the box, with the lever quadrants sitting just above floor level upstairs. Hopefully!


The drive from the frame drops down onto the floor of the locking room, which is secured to the lengths of rail that were set into the structure at the very outset of the project. Thus, everything is (eventually) tied together to prevent movement between different components, which would lead to all sorts of problems! The frame will be bolted to the girders, which in turn will be fastened down to the pillars.

One of the next posts will cover the fastening of the floor to the rails...

In the photos, the two girders are shown temporarily bolted together with studding, to improve stability.



The girders will be lifted out for proper painting , which will take place whilst the locking room is finished off. At that stage, the girders will be reinstalled, the frame fitted on top, and the rest of the (final) operating floor installed.